STARNIQUE Logo
  • Home
  • About
  • Services
  • Projects
  • Gallery
  • Clients
  • Contact
  • Call Us

Project Gallery

  1. Home
  2. Gallery
Erection, Blasting and painting of tank 28 in warri refining & petrochemical. Co.
Erection, Blasting and painting of tank 28 in warri refining & petrochemical. Co.

WRPC

Construction of J-Tubes and various components and Install same to Cawthorne Channel Marine Cable Laying Project.
Construction of J-Tubes and various components and Install same to Cawthorne Channel Marine Cable Laying Project.

CNS Subsea / Eng Rxpac J.V.

Replacement of 12
Replacement of 12" x 80mts clamped AGO Line at Jetty

WRPC

Fabrication and Installation of H-beam, hand rails and others on USARI
Fabrication and Installation of H-beam, hand rails and others on USARI "C" platform.

Mobil Producing

Retubing of crude column overhead trim cooler (10E14A)
Retubing of crude column overhead trim cooler (10E14A)

PHRC

Fabrication of Robertkiri Crude Oil Loading North Jetty Platform
Fabrication of Robertkiri Crude Oil Loading North Jetty Platform

CHEVRON NIG. LTD

36
36" x 4 kilo mts underground piping work on Kano state water dam project in Kano

PCI/COSTAIN Joint venture

Rehabilitation Boiler Tube on Boiler 01, 02, & 03 of power plant
Rehabilitation Boiler Tube on Boiler 01, 02, & 03 of power plant

Port Harcourt Refining Co.

Installation and commissioning of new control valves at HRSG 1 & 2
Installation and commissioning of new control valves at HRSG 1 & 2

WRPC

Repairs of platformers stabilizer Column, 12C506.
Repairs of platformers stabilizer Column, 12C506.

PHRC

Repairs work on Dearator 70D05-E01, Ancillary Equipment.
Repairs work on Dearator 70D05-E01, Ancillary Equipment.

PHRC

The emergency repairs of 10C01 in area 1 VDU
The emergency repairs of 10C01 in area 1 VDU

PHRC

The fabrication, installation and inspection of flowline and platform
The fabrication, installation and inspection of flowline and platform

Geoservices Ltd

The Installation, Tie-in and commissioning of new Atlas Copco Air compressor, 75K01C
The Installation, Tie-in and commissioning of new Atlas Copco Air compressor, 75K01C

PHRC

The mechanical/piping works for new cryogenic nitrogen Plant
The mechanical/piping works for new cryogenic nitrogen Plant

PHRC

Emergency repairs of 10C01
Emergency repairs of 10C01

PHRC

Replacement of the main column bottoms steam generators (Heat Exchangers) 16E04A/B
Replacement of the main column bottoms steam generators (Heat Exchangers) 16E04A/B

PHRC

Replacement of acid flare line from 29C01 through 16C51 to area 2 battery limit.
Replacement of acid flare line from 29C01 through 16C51 to area 2 battery limit.

PHRC

Repairs on failed section of FCC 16R01&16R02 arising from 1st and 2nd inspection
Repairs on failed section of FCC 16R01&16R02 arising from 1st and 2nd inspection

PHRC

Preparation for inspection of mechanical static equipment in area 2 & 3
Preparation for inspection of mechanical static equipment in area 2 & 3

PHRC

Demolition and Recasting of heater floor
Demolition and Recasting of heater floor

ND Refineries Ltd

Heat Exchanger Services
Heat Exchanger Services

ND Refineries Ltd

Fabrication and erection of 6
Fabrication and erection of 6"&8" pipe for oil movement.

PHRC

Rehabilitation of Column in Area 1&2, Area 5
Rehabilitation of Column in Area 1&2, Area 5

Montego

Integrity Check and Repairs on HFO Cooler Tubes
Integrity Check and Repairs on HFO Cooler Tubes

Aradel Ltd

Area 2 Line pipes supply for process plant
Area 2 Line pipes supply for process plant

PHRC Ltd

STARNIQUE Logo

Delivering world-class engineering, construction, and maintenance solutions since 1990.

Quick Links
  • About Us
  • Services
  • Projects
  • Gallery
  • Contact
Contact Info
  • Head Office: No. 53 Wimpey – College of Education Road, Rumuolumeni, Port Harcourt
  • 08033103889
  • info@starnique.com
Newsletter

Subscribe to get our latest news and updates.

© 2026 STARNIQUE NIGERIA LIMITED. All Rights Reserved. | Developed by PsalmTheTechGuy

Privacy Policy