| Erection, Blasting and painting of tank 28 in warri refining & petrochemical. Co. |
WRPC |
2010 |
N57,362,571.97 |
Completed |
| Construction of J-Tubes and various components and Install same to Cawthorne Channel Marine Cable Laying Project. |
CNS Subsea / Eng Rxpac J.V. |
2010 |
N41,550,000.00 |
Completed |
| Replacement of 12" x 80mts clamped AGO Line at Jetty |
WRPC |
2010 |
N54,240,000.00 |
Completed |
| Fabrication and Installation of H-beam, hand rails and others on USARI "C" platform. |
Mobil Producing |
2010 |
N59,574,000.00 |
Completed |
| Retubing of crude column overhead trim cooler (10E14A) |
PHRC |
2011 |
N23,550,000.00 |
Completed |
| Fabrication of Robertkiri Crude Oil Loading North Jetty Platform |
CHEVRON NIG. LTD |
2011 |
N75,750,000.00 |
Completed |
| 36" x 4 kilo mts underground piping work on Kano state water dam project in Kano |
PCI/COSTAIN Joint venture |
2011 |
N65,065,000.00 |
Completed |
| Rehabilitation Boiler Tube on Boiler 01, 02, & 03 of power plant |
Port Harcourt Refining Co. |
2012 |
N37,850,745.00 |
Completed |
| Installation and commissioning of new control valves at HRSG 1 & 2 |
WRPC |
2013 |
N14,757,187.50 |
Completed |
| Repairs of platformers stabilizer Column, 12C506. |
PHRC |
2015 |
N12,267,800.00 |
Completed |
| Repairs work on Dearator 70D05-E01, Ancillary Equipment. |
PHRC |
2015 |
N6,026,750.00 |
Completed |
| The emergency repairs of 10C01 in area 1 VDU |
PHRC |
2015 |
N133,000,000.00 |
Completed |
| The fabrication, installation and inspection of flowline and platform |
Geoservices Ltd |
2015 |
N10,762,800.00 |
Completed |
| The Installation, Tie-in and commissioning of new Atlas Copco Air compressor, 75K01C |
PHRC |
2016 |
N18,767,437.50 |
Completed |
| The mechanical/piping works for new cryogenic nitrogen Plant |
PHRC |
2016 |
N60,000,000.00 |
Completed |
| Emergency repairs of 10C01 |
PHRC |
2016 |
N133,302,987.50 |
Completed |
| Replacement of the main column bottoms steam generators (Heat Exchangers) 16E04A/B |
PHRC |
2017 |
N19,789,875.00 |
Completed |
| Replacement of acid flare line from 29C01 through 16C51 to area 2 battery limit. |
PHRC |
2017 |
N21,964,500.00 |
Completed |
| Repairs on failed section of FCC 16R01&16R02 arising from 1st and 2nd inspection |
PHRC |
2018 |
N181,251,400.00 |
Completed |
| Preparation for inspection of mechanical static equipment in area 2 & 3 |
PHRC |
2019 |
N25,113,000.00 |
Completed |
| Demolition and Recasting of heater floor |
ND Refineries Ltd |
2021 |
N8,500,000.00 |
Completed |
| Heat Exchanger Services |
ND Refineries Ltd |
2021 |
N7,000,000.00 |
Completed |
| Fabrication and erection of 6"&8" pipe for oil movement. |
PHRC |
2021 |
N32,745,000.00 |
Completed |
| Rehabilitation of Column in Area 1&2, Area 5 |
Montego |
2022 - 2023 |
N585,000,000.00 |
Ongoing |
| Integrity Check and Repairs on HFO Cooler Tubes |
Aradel Ltd |
2023 |
N9,500,000.00 |
Completed |
| Area 2 Line pipes supply for process plant |
PHRC Ltd |
2024 |
N207,350,000.00 |
Completed |