Project Name Client Award Year Contract Value Status
Erection, Blasting and painting of tank 28 in warri refining & petrochemical. Co. WRPC 2010 N57,362,571.97 Completed
Construction of J-Tubes and various components and Install same to Cawthorne Channel Marine Cable Laying Project. CNS Subsea / Eng Rxpac J.V. 2010 N41,550,000.00 Completed
Replacement of 12" x 80mts clamped AGO Line at Jetty WRPC 2010 N54,240,000.00 Completed
Fabrication and Installation of H-beam, hand rails and others on USARI "C" platform. Mobil Producing 2010 N59,574,000.00 Completed
Retubing of crude column overhead trim cooler (10E14A) PHRC 2011 N23,550,000.00 Completed
Fabrication of Robertkiri Crude Oil Loading North Jetty Platform CHEVRON NIG. LTD 2011 N75,750,000.00 Completed
36" x 4 kilo mts underground piping work on Kano state water dam project in Kano PCI/COSTAIN Joint venture 2011 N65,065,000.00 Completed
Rehabilitation Boiler Tube on Boiler 01, 02, & 03 of power plant Port Harcourt Refining Co. 2012 N37,850,745.00 Completed
Installation and commissioning of new control valves at HRSG 1 & 2 WRPC 2013 N14,757,187.50 Completed
Repairs of platformers stabilizer Column, 12C506. PHRC 2015 N12,267,800.00 Completed
Repairs work on Dearator 70D05-E01, Ancillary Equipment. PHRC 2015 N6,026,750.00 Completed
The emergency repairs of 10C01 in area 1 VDU PHRC 2015 N133,000,000.00 Completed
The fabrication, installation and inspection of flowline and platform Geoservices Ltd 2015 N10,762,800.00 Completed
The Installation, Tie-in and commissioning of new Atlas Copco Air compressor, 75K01C PHRC 2016 N18,767,437.50 Completed
The mechanical/piping works for new cryogenic nitrogen Plant PHRC 2016 N60,000,000.00 Completed
Emergency repairs of 10C01 PHRC 2016 N133,302,987.50 Completed
Replacement of the main column bottoms steam generators (Heat Exchangers) 16E04A/B PHRC 2017 N19,789,875.00 Completed
Replacement of acid flare line from 29C01 through 16C51 to area 2 battery limit. PHRC 2017 N21,964,500.00 Completed
Repairs on failed section of FCC 16R01&16R02 arising from 1st and 2nd inspection PHRC 2018 N181,251,400.00 Completed
Preparation for inspection of mechanical static equipment in area 2 & 3 PHRC 2019 N25,113,000.00 Completed
Demolition and Recasting of heater floor ND Refineries Ltd 2021 N8,500,000.00 Completed
Heat Exchanger Services ND Refineries Ltd 2021 N7,000,000.00 Completed
Fabrication and erection of 6"&8" pipe for oil movement. PHRC 2021 N32,745,000.00 Completed
Rehabilitation of Column in Area 1&2, Area 5 Montego 2022 - 2023 N585,000,000.00 Ongoing
Integrity Check and Repairs on HFO Cooler Tubes Aradel Ltd 2023 N9,500,000.00 Completed
Area 2 Line pipes supply for process plant PHRC Ltd 2024 N207,350,000.00 Completed